Latest

Selected Works: The Tolbooth, West Wemyss 16.09.2025
Learning Through Making: GRAS at Leith Academy 28.08.2025
Studio Day Out — Learning from Broadwoodside 17.08.2025
Preston Tower Featured in RIAS Quarterly: Building Resilience through Conservation 05.08.2025
Kyle House in Isabelle Priest’s “New Scottish Houses: Contemporary Architecture and Living in the Landscape” 29.07.2025
Natasha Huq Co-Presents RIBA House of the Year on Grand Designs 23.07.2025
3 Days of Design, Copenhagen, June 2025 08.07.2025
GRAS joined the Scottish Vernacular Buildings Working Group 05.07.2025
Burr’s of Tongue awarded Silver at Scottish Design Awards 2025 27.06.2025
Jess Elliott Dennison at Lamb’s House: A Spring Cookery Workshop 24.06.2025
View all entries
West Wemyss Tolbooth
GRAS-West Wemyss-©Fredrik Frendin-low res-03

The Tolbooth in West Wemyss is a rare example of Scotland’s civic architecture. Built in the early eighteenth century, and possibly incorporating earlier fabric, this two-storey building with its projecting clock tower has long held a civic presence on Main Street. One of only ninety tolbooths that remain across the country, this B-listed structure embodies the village’s status as a burgh of barony and its history as a centre of administration, trade and ceremony.

By the late twentieth century, unsympathetic repairs had accelerated the building’s decay. Cementitious harling and pointing, applied in a maritime context, had cracked and trapped moisture, leading to significant deterioration of the underlying stone. The first phase of conservation, led by GRAS in close collaboration with Graeme Brown Stonemason, set out to reverse this damage and secure the Tolbooth’s external fabric.

Scaffolding allowed for a close survey of the masonry, roof and tower. Cement harling was carefully stripped back to expose the underlying rubble and dressings, many of which showed laminations, erosion and previous failed repairs. Defective areas were indented or replaced with matching sandstone, informed by sampling from the Scottish Lime Centre Trust. Pinning, packing and comprehensive repointing were undertaken with lime mortars before the building was re-harled in a through-coloured lime render, reinstating a moisture-open breathable envelope. At the highest level of the tower, where the eaves course had delaminated beyond repair, new stone was cut and bedded to match the weathered originals, guided by structural input from Narro Associates.

Other repairs included the replacement of oversized copper roof panels, where star-cracking had occurred, with new sections of more appropriate scale; the installation of a new oak-studded entrance door made by traditional methods; and the repair of masonry and cobbled surfaces at the pend. The forestair was fitted with a new painted galvanised handrail in a period style to replace the badly corroded wrought iron.

The work was delivered through the combined expertise of Graeme Brown Stonemasons, Graciela Ainsworth Sculpture Conservation, Blake’s Roofing, Crown Traditional Craftsmen and Andrew Turner Blacksmiths, under the guidance of Morham & Brotchie as quantity surveyors. Every intervention was informed by detailed inspection, balancing the retention of historic fabric with carefully judged replacement where necessary.

The Wemyss 1952 Trust, long-term custodians of the Tolbooth, have played a central role in securing its future by committing to a phased programme of works. This first stage, though focused on largely unseen repair, represents an essential act of care and investment in continuity. By consolidating the external fabric, the project establishes the foundation for interior adaptation in the next phase, where historic features revealed during survey will be reinstated alongside a new residential use. In doing so, the Tolbooth is prepared not only for renewal but for a return of civic presence, reasserting its role as a landmark on Main Street and as a shared point of identity in village life. 

Location

West Wemyss, Fife

Client

Wemyss 1952 Trust

Completed

2025

Type

Conservation

GRAS

Gavin McNab
Charlie Porter

Main Contractor

G Brown Stonemason Ltd.

Consultants & Subcontractors

Blake’s Roofing
Crown Traditional Craftsmen
Andrew Turner Blacksmith
Graciela Ainsworth Sculpture Conservation

Photography

Fredrik Frendin

West Wemyss Tolbooth

West Wemyss Tolbooth Details

GRAS_Tolbooth West Wemyss Site Plan

Recent work to consolidate the external envelope of the building — undertaken by GRAS in collaboration with G Brown Stonemason — balanced structural need with heritage attentiveness. Where possible, original elements were stabilised; where necessary, replaced — using the removed stones as a reference for detail and form.

GRAS-West Wemyss-©Fredrik Frendin-low res-06
GRAS-West Wemyss-©Fredrik Frendin-low res-07
GRAS_Tolbooth West Wemyss Drawings by Charlie Porter
GRAS_Tolbooth West Wemyss Drawings by Charlie Porter3
GRAS_Tolbooth West Wemyss Drawings by Charlie Porter2

The Wemyss 1952 Trust, long-term custodians of the Tolbooth, have played a central role in securing its future by committing to a phased programme of works. This first stage, though focused on largely unseen repair, represents an essential act of care and investment in continuity.

Material Focus

Cement harling was carefully stripped back to expose the underlying rubble and dressings, many of which showed laminations, erosion and previous failed repairs. Defective areas were indented or replaced with matching sandstone, informed by sampling from the Scottish Lime Centre Trust. Pinning, packing and comprehensive repointing were undertaken with lime mortars before the building was re-harled in a through-coloured lime render, reinstating a moisture-open breathable envelope. At the highest level of the tower, where the eaves course had delaminated beyond repair, new stone was cut and bedded to match the weathered originals, guided by structural input from Narro Associates.

Other repairs included the replacement of oversized copper roof panels, where star-cracking had occurred, with new sections of more appropriate scale; the installation of a new oak-studded entrance door made by traditional methods; and the repair of masonry and cobbled surfaces at the pend. The forestair was fitted with a new painted galvanised handrail in a period style to replace the badly corroded wrought iron.